glossary:atcdemo2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
glossary:atcdemo2 [2014/11/11 13:29] – external edit 127.0.0.1 | glossary:atcdemo2 [2024/10/02 10:46] (current) – update to mention ATC2 etc Bob Vetterlein | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Shuttle Demo - ATC & CSR4 ====== | ====== Shuttle Demo - ATC & CSR4 ====== | ||
+ | The ATC & CSR4 kits shown here have been discontinued and replaced by ATC2 & ENDS, functionality remains the same, the PCBs have been redesigned to provide greater flexibility in implementing more complex setups. | ||
+ | |||
+ | {{ : | ||
The shuttle module or ATC (Automatic Train Controller) MERG Kit 46, comes preprogrammed with a number of different configurations, | The shuttle module or ATC (Automatic Train Controller) MERG Kit 46, comes preprogrammed with a number of different configurations, | ||
Line 11: | Line 14: | ||
The ATC module has two track outputs designated ' | The ATC module has two track outputs designated ' | ||
For any configuration with more than 2 ends, some switching is required, this is achieved using the CSR4 (Cab Select Relay x 4) module, MERG Kit 46. This has 8 relays arranged in pairs providing a means of switching either of the ATC outputs or none (off) to each of 4 supplementary outputs. This gives provision for 4 stopping places or ends which may be at any one time off, end or intermediate. | For any configuration with more than 2 ends, some switching is required, this is achieved using the CSR4 (Cab Select Relay x 4) module, MERG Kit 46. This has 8 relays arranged in pairs providing a means of switching either of the ATC outputs or none (off) to each of 4 supplementary outputs. This gives provision for 4 stopping places or ends which may be at any one time off, end or intermediate. | ||
+ | |||
+ | In the photo the demo is currently on Configuration ' |
glossary/atcdemo2.1415712584.txt.gz · Last modified: 2014/11/11 13:29 by 127.0.0.1