public:shants
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
public:shants [2022/05/15 18:12] – corrected contact link and added tag andy1878 | public:shants [2024/02/14 11:36] (current) – ianh | ||
---|---|---|---|
Line 10: | Line 10: | ||
====== MERG South Hampshire Area Group ====== | ====== MERG South Hampshire Area Group ====== | ||
- | < | + | < |
+ | <WRAP group> | ||
+ | <WRAP column quarter> | ||
+ | [[https:// | ||
+ | </ | ||
+ | <WRAP column quarter> | ||
+ | [[https:// | ||
+ | </ | ||
+ | <WRAP column quarter> | ||
+ | [[https:// | ||
+ | </ | ||
+ | <WRAP column quarter> | ||
+ | [[areagroups: | ||
+ | </ | ||
+ | </ | ||
+ | </ | ||
<WRAP hide> | <WRAP hide> | ||
Line 66: | Line 81: | ||
<WRAP info round> | <WRAP info round> | ||
- | Whilst restrictions are in place, we are using Zoom video calls. | + | We meet at the Southampton Model Railway Society (SMRS) clubroom and also on Zoom.\\ |
+ | Dates and details of the meetings are listed below and on the MERG diary https:// | ||
- | We meet at the Southampton Model Railway Society (SMRS) clubroom. Meeting Venue: | + | The SMRS clubroom |
- | \\ | + | Bitterne railway station is nearby and about 10 minutes walk to Kemps Quay.\\ |
- | Evening meetings | + | |
+ | Evening meetings | ||
\\ | \\ | ||
Workshop days normally take place on the 3rd Saturday of each month, unless we are representing MERG at an exhibition, starting at 10:00am (clubroom is usually open by 09:45am).\\ | Workshop days normally take place on the 3rd Saturday of each month, unless we are representing MERG at an exhibition, starting at 10:00am (clubroom is usually open by 09:45am).\\ | ||
Line 81: | Line 98: | ||
\\ | \\ | ||
We are currently rebuilding an 009 exhibition layout to enhance its operational capabilities and possibly add some animations.\\ | We are currently rebuilding an 009 exhibition layout to enhance its operational capabilities and possibly add some animations.\\ | ||
- | The layout is being controlled by MERG CBUS and DCC modules. It will be controlled using route selection from a single control panel and one or two CANCABs | + | The layout is being controlled by MERG CBUS and DCC modules. It can be controlled using route selection from a single control panel and one or two CANCABs |
+ | Recently the layout has been upgraded to be automatically controlled by JMRI running on a laptop. 3 trains can operate under computer control.\\ | ||
+ | The pictures below are from its first public show at the Southampton MRC exhibition in January 2024.\\ | ||
\\ | \\ | ||
- | {{:public:shsag7.jpg?380|}} | + | {{:areagroups:soton2a.jpg?300 |}} |
- | {{:public:shsag5.jpg?222|}} | + | {{:areagroups:soton3a.jpg?500 |}} |
- | {{:public:shsag6.jpg?154|}}\\ | + | {{:areagroups:soton4.jpg?400 |}}\\ |
</ | </ | ||
Line 109: | Line 128: | ||
[[https:// | [[https:// | ||
</ | </ | ||
+ | <WRAP box round> | ||
+ | <WRAP group> | ||
+ | <WRAP column quarter> | ||
+ | [[https:// | ||
+ | </ | ||
+ | <WRAP column quarter> | ||
+ | [[https:// | ||
+ | </ | ||
+ | <WRAP column quarter> | ||
+ | [[https:// | ||
+ | </ | ||
+ | <WRAP column quarter> | ||
+ | [[areagroups: | ||
+ | </ | ||
+ | </ | ||
+ | </ | ||
{{tag> | {{tag> |
public/shants.1652638366.txt.gz · Last modified: 2022/05/15 18:12 by andy1878