glossary:thomasbc3
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
glossary:thomasbc3 [2019/02/26 16:46] – cjeb47 | glossary:thomasbc3 [2019/02/26 16:47] – cjeb47 | ||
---|---|---|---|
Line 9: | Line 9: | ||
The signals will use the original SDS2 boards (kit 36), by using a trigger taken from each section of the ATC system to indicate to the signals that a section is occupied. | The signals will use the original SDS2 boards (kit 36), by using a trigger taken from each section of the ATC system to indicate to the signals that a section is occupied. | ||
- | Nb.p This is still being worked on at present. | + | Nb.This is still being worked on at present. |
glossary/thomasbc3.txt · Last modified: 2019/02/26 20:16 by Bob Vetterlein