glossary:thomasbc3
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
glossary:thomasbc3 [2019/02/26 13:03] – Bob Vetterlein | glossary:thomasbc3 [2019/02/26 20:16] (current) – Bob Vetterlein | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Superbloc BC3 Demonstration ====== | + | ====== Superbloc BC3 Demonstration |
+ | |||
+ | This demonstration **[[exhibition_stand|cabinet]]** contains an oval of track which is divided into 4 sections. Each of these was controlled by a **BC3, MERG [[: | ||
+ | \\ **Traction rebuilt as:** | ||
+ | ====== ATC - Automatic Train Controller - Shuffle mode demonstration ====== | ||
+ | The traction for this demo is being converted to use 4 x ATC Kit 45, made into one unit and configured as a four section " | ||
+ | As this requires one section always to be empty, a four section shuffle can only have a maximum of three trains on the circle of track, each one occupying one section of the track. | ||
+ | This means that the first train moves into the empty section, then the second train moves into the now empty first section followed by the the third train moving into the section vacated by the second train. | ||
+ | The first train then moves into the section vacated by the third train, and so on ad infinitum. | ||
+ | The signals will use the original SD2 boards (kit 36), by using a trigger taken from each section of the ATC system to indicate to the signals that a section is occupied. | ||
+ | |||
+ | Nb.This is still being worked on at present.\\ | ||
+ | **This cabinet also contains the [[glossary: | ||
- | This demonstration [[exhibition_stand|cabinet]] contains an oval of track which is divided into 4 sections. Each of these is controlled by a BC3, MERG [[: | ||
- | =====BC3 Demo Retired===== | ||
- | The traction for this demo has been converted to use Kits 45 & 46 the ATC ' |
glossary/thomasbc3.txt · Last modified: 2019/02/26 20:16 by Bob Vetterlein