THE RAILWAYCONTROL WEBPAGES

To remove advertising banner above click here

 

CARLOS

Computer Aided Railway Layout Operating System

carlicon.gif (7347 bytes)  Updated 10/2/2000

  1. Layout Drawing, using Drag-and-Drop items to define the layout arrangement. Such items as Track,  Signals & Buttons can be used at will.
  2. Association, where the drawn items are associated with their actual hardware controls.
  3. Operation, where the created layout file is used to actually operate the layout. Various operating techniques may be used, such as NX Route Selection, conventional Signal Box levers etc.

back to MERG home page